Remodel & Addition Building Permits in Metro Atlanta
When you change the footprint, structure, or major systems of your home, most cities and counties require a building permit. At Permit ATL, we prepare the drawings, complete the paperwork, and track approvals so your remodel or addition can move forward without delay.
When Is a Permit Required?
Room additions or bump-outs
Second stories or finished attics/basements
Major kitchen/bath renovations with new plumbing or electrical
Window or door replacements that change openings
Where We File
Roswell • Alpharetta • Sandy Springs • Johns Creek • Milton • Atlanta • Fulton County • Forsyth County • Cobb County• Cherokee County • DeKalb County• Gwinnett County • Hall County
What We Do
Permit-ready architectural drawings
Application prep & submittal
Corrections & resubmittals
Coordination with engineers (if needed)
Permit tracking through approval
Steps
Quick call to confirm scope
Gather drawings & details
Submit application
Address plan review comments
Permit issued
Timeline
2–6 weeks depending on city/county workload.
What You’ll Need
Floor plans & elevations (existing + proposed)
Site plan showing additions
Contractor info if selected
Common Review Comments
Show structural details for new openings
Confirm egress for bedrooms
Provide smoke/CO detector layout
Clarify plumbing & electrical notes
Pricing
Most remodel/addition permit packages are flat fee + corrections hourly. We’ll confirm after a quick call.
Commonly Asked Questions
Can I live in the house during a remodel? Often yes, but permits may require safety notes and inspections.
Do I need stamped drawings? Sometimes. We’ll coordinate engineers if required.
Can you combine remodel & addition permits? Yes, we’ll streamline into one application.